Automation index
How much of a Airport ramp agent’s job can AI already do?
A load plan comes earlier. Pushing the aircraft, the bags and not getting the trim wrong do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Airport ramp agent
21%
AI can already do 21% of this job.
#404 / 633
View rankingAirport ramp agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Load plan, LIR and hold allocation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Load, unload, pushback and ramp assistance.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Bags, ULDs and special cargo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate with crew, ops and fuel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Times, delays and ramp safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Trim, papers and liability for the load.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load aircraft
- do pushback
- allocate holds
- move bags
- load planning
- ramp assistance
- handle ULDs
- ramp safety
Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333
IS WORK OVER?
Renewables engineer
27%
#163 / 633
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149