IS WORK OVER?

Automation index

How much of a Alarm installer’s job can AI already do?

A diagram and an app come earlier. Wiring without false alarms and training the neighbour do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Alarm installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagram, zones and programming the panel.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Wire, sensors and the detector that trips alone.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
ARC, tests and the connection note.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Train the user and the fob that gets lost.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The lived-in flat, the brick and not breaking extra.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No false alarms, and a real call-out.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit alarms
  • program panels
  • wire sensors
  • ARC
  • avoid false alarms
  • train the user
  • detectors
  • alarm zones

Sources for this job· O*NET 49-2098.00· ESCO/ISCO 7412

Gas network engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, pressures and the diameter.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Trench, the weld and the one that was not x-rayed.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Leak, the detector and getting people out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cut, the bypass and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the rush and not covering without testing.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the trench does not go up, and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • network pressures
  • diameters
  • trenches
  • gas welds
  • leaks
  • detectors
  • bypass
  • x-rays

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 336Haematologist23%
  2. 337Infectious disease physician23%
  3. 338Labour inspector23%
  4. 340Home-automation installer23%
  5. 341Station master23%
  6. 342Aircraft mechanic23%