Automation index
How much of a Alarm installer’s job can AI already do?
A diagram and an app come earlier. Wiring without false alarms and training the neighbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Alarm installer
23%
AI can already do 23% of this job.
#300 / 633
View rankingAlarm installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagram, zones and programming the panel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Wire, sensors and the detector that trips alone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
ARC, tests and the connection note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Train the user and the fob that gets lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The lived-in flat, the brick and not breaking extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No false alarms, and a real call-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit alarms
- program panels
- wire sensors
- ARC
- avoid false alarms
- train the user
- detectors
- alarm zones
Sources for this job· O*NET 49-2098.00· ESCO/ISCO 7412
IS WORK OVER?
Tower crane operator
18%
#573 / 633
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343