IS WORK OVER?

Automation index

How much of a Alarm installer’s job can AI already do?

A diagram and an app come earlier. Wiring without false alarms and training the neighbour do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Alarm installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagram, zones and programming the panel.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Wire, sensors and the detector that trips alone.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
ARC, tests and the connection note.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Train the user and the fob that gets lost.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The lived-in flat, the brick and not breaking extra.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No false alarms, and a real call-out.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit alarms
  • program panels
  • wire sensors
  • ARC
  • avoid false alarms
  • train the user
  • detectors
  • alarm zones

Sources for this job· O*NET 49-2098.00· ESCO/ISCO 7412

Welding inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, qualification and the bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Visual, the pore and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the report and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the access and the welder who rushes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The deadline, the pressure and not signing the pore.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Accept the sound bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • beads
  • pores
  • welder qualification
  • weld NDT
  • site
  • access
  • inspection reports

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

Analyse my job

Jobs with similar scores

  1. 302Haematologist23%
  2. 303Infectious disease physician23%
  3. 304Labour inspector23%
  4. 306Home-automation installer23%
  5. 307Station master23%
  6. 308Aircraft mechanic23%