Automation index
How much of a Alarm installer’s job can AI already do?
A diagram and an app come earlier. Wiring without false alarms and training the neighbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Alarm installer
23%
AI can already do 23% of this job.
#300 / 633
View rankingAlarm installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagram, zones and programming the panel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Wire, sensors and the detector that trips alone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
ARC, tests and the connection note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Train the user and the fob that gets lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The lived-in flat, the brick and not breaking extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No false alarms, and a real call-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit alarms
- program panels
- wire sensors
- ARC
- avoid false alarms
- train the user
- detectors
- alarm zones
Sources for this job· O*NET 49-2098.00· ESCO/ISCO 7412
IS WORK OVER?
Winemaker
25%
#223 / 633
View rankingWinemaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lab work, densities and fermentation control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Tasting, blending and the call on the vintage.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Vineyard, ripeness and when to pick.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Ageing, barrel, filtration and bottling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cellar, records and the board’s visit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Signing the vintage and owning the bottle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make wine
- taste musts
- blend wines
- control fermentation
- decide harvest
- age in barrel
- bottle
- sign the vintage
Sources for this job· O*NET 19-1012.00· ESCO/ISCO 2145