Automation index
How much of a Ambulance driver’s job can AI already do?
A call and a route come earlier. Arriving in one piece and not making the patient worse do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ambulance driver
18%
AI can already do 18% of this job.
#671 / 743
View rankingAmbulance driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calls, routes and service logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive urgent, park and help the technician.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Stretcher, transfer and family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cleaning, kit and handovers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Hospital, ICU and times.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not arriving late to a heart attack.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive
- route
- load goods
- Calls, routes and service logs
- Drive urgent, park and help the technician
- Stretcher, transfer and family
- Cleaning, kit and handovers
- Hospital, ICU and times
- Not arriving late to a heart attack
- conductor de ambulancia
Sources for this job· O*NET 53-3011.00· ESCO/ISCO 8322
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142