Automation index
How much of a Anaesthetist’s job can AI already do?
An anaesthetic plan and a consent form come earlier. Putting someone under and bringing them back do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Anaesthetist
21%
AI can already do 21% of this job.
#501 / 753
View rankingAnaesthetist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess pre-op, allergies and the anaesthetic plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Induce, maintain and wake in theatre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch vitals, lines and acute pain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the patient and sign the consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Notes, consults and coordination with the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
On-call, resuscitation and liability for the act.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Induce, maintain and wake in theatre
- Watch vitals, lines and acute pain
- Brief the patient and sign the consent
- anestesista
- anestesiologo
- anesthesiologist
- anaesthetist
Sources for this job· O*NET 29-1211.00· ESCO/ISCO 2212
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165