Automation index
How much of a Anaesthetist’s job can AI already do?
An anaesthetic plan and a consent form come earlier. Putting someone under and bringing them back do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Anaesthetist
21%
AI can already do 21% of this job.
#406 / 633
View rankingAnaesthetist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess pre-op, allergies and the anaesthetic plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Induce, maintain and wake in theatre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch vitals, lines and acute pain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the patient and sign the consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Notes, consults and coordination with the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
On-call, resuscitation and liability for the act.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Induce, maintain and wake in theatre
- Watch vitals, lines and acute pain
- Brief the patient and sign the consent
- anestesista
- anestesiologo
- anesthesiologist
- anaesthetist
Sources for this job· O*NET 29-1211.00· ESCO/ISCO 2212
IS WORK OVER?
Naval architect
25%
#240 / 633
View rankingNaval architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stability, strength and hull forms.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, specs and class rules.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Yard, sea trials and owner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Systems, machinery and onboard safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, IMO and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a hull that will not break.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Stability, strength and hull forms
- Drawings, specs and class rules
- Yard, sea trials and owner
- Systems, machinery and onboard safety
- Rules, IMO and documentation
- Sign a hull that will not break
- ingeniero naval
Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144