Automation index
How much of a Anaesthetist’s job can AI already do?
An anaesthetic plan and a consent form come earlier. Putting someone under and bringing them back do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Anaesthetist
21%
AI can already do 21% of this job.
#406 / 633
View rankingAnaesthetist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess pre-op, allergies and the anaesthetic plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Induce, maintain and wake in theatre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch vitals, lines and acute pain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the patient and sign the consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Notes, consults and coordination with the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
On-call, resuscitation and liability for the act.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Induce, maintain and wake in theatre
- Watch vitals, lines and acute pain
- Brief the patient and sign the consent
- anestesista
- anestesiologo
- anesthesiologist
- anaesthetist
Sources for this job· O*NET 29-1211.00· ESCO/ISCO 2212
IS WORK OVER?
Paver
19%
#526 / 633
View rankingPaver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, levels and layer thickness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, compact and the edge that opens.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Joints, seals and the gully junction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Plant, mix temperature and the cold day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving a step.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No ponding, and not skimping compaction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- lay asphalt
- compact
- falls
- pavement joints
- gullies
- mix temperature
- pavement levels
- seals
Sources for this job· O*NET 47-2071.00· ESCO/ISCO 7112