Automation index
How much of a Anaesthetist’s job can AI already do?
An anaesthetic plan and a consent form come earlier. Putting someone under and bringing them back do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Anaesthetist
21%
AI can already do 21% of this job.
#406 / 633
View rankingAnaesthetist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess pre-op, allergies and the anaesthetic plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Induce, maintain and wake in theatre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch vitals, lines and acute pain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the patient and sign the consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Notes, consults and coordination with the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
On-call, resuscitation and liability for the act.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Induce, maintain and wake in theatre
- Watch vitals, lines and acute pain
- Brief the patient and sign the consent
- anestesista
- anestesiologo
- anesthesiologist
- anaesthetist
Sources for this job· O*NET 29-1211.00· ESCO/ISCO 2212
IS WORK OVER?
Power-plant operator
19%
#517 / 633
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131