Automation index
How much of a Anaesthetist’s job can AI already do?
An anaesthetic plan and a consent form come earlier. Putting someone under and bringing them back do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Anaesthetist
21%
AI can already do 21% of this job.
#494 / 743
View rankingAnaesthetist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess pre-op, allergies and the anaesthetic plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Induce, maintain and wake in theatre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch vitals, lines and acute pain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Brief the patient and sign the consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Notes, consults and coordination with the surgeon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
On-call, resuscitation and liability for the act.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Induce, maintain and wake in theatre
- Watch vitals, lines and acute pain
- Brief the patient and sign the consent
- anestesista
- anestesiologo
- anesthesiologist
- anaesthetist
Sources for this job· O*NET 29-1211.00· ESCO/ISCO 2212
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142