IS WORK OVER?

Automation index

How much of a Anaesthetist’s job can AI already do?

An anaesthetic plan and a consent form come earlier. Putting someone under and bringing them back do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Anaesthetist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assess pre-op, allergies and the anaesthetic plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Induce, maintain and wake in theatre.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Watch vitals, lines and acute pain.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Brief the patient and sign the consent.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Notes, consults and coordination with the surgeon.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
On-call, resuscitation and liability for the act.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Induce, maintain and wake in theatre
  • Watch vitals, lines and acute pain
  • Brief the patient and sign the consent
  • anestesista
  • anestesiologo
  • anesthesiologist
  • anaesthetist

Sources for this job· O*NET 29-1211.00· ESCO/ISCO 2212

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Analyse my job

Jobs with similar scores

  1. 403Zoologist22%
  2. 404Airport ramp agent21%
  3. 405Traffic warden21%
  4. 407Beekeeper21%
  5. 408Aluminium carpenter21%
  6. 409Pork butcher21%