IS WORK OVER?

Automation index

How much of a Anaesthetist’s job can AI already do?

An anaesthetic plan and a consent form come earlier. Putting someone under and bringing them back do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Anaesthetist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assess pre-op, allergies and the anaesthetic plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Induce, maintain and wake in theatre.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Watch vitals, lines and acute pain.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Brief the patient and sign the consent.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Notes, consults and coordination with the surgeon.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
On-call, resuscitation and liability for the act.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Induce, maintain and wake in theatre
  • Watch vitals, lines and acute pain
  • Brief the patient and sign the consent
  • anestesista
  • anestesiologo
  • anesthesiologist
  • anaesthetist

Sources for this job· O*NET 29-1211.00· ESCO/ISCO 2212

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 412Zoologist22%
  2. 413Airport ramp agent21%
  3. 414Traffic warden21%
  4. 416Beekeeper21%
  5. 417Aluminium carpenter21%
  6. 418Pork butcher21%