Automation index
How much of a Anthropologist’s job can AI already do?
A transcript and a code come earlier. Being in the field and not projecting too much do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Anthropologist
23%
AI can already do 23% of this job.
#287 / 633
View rankingAnthropologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Transcribe, code and write.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Field, interviews and observation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Archive, literature and research design.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Ethics, consent and communities.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Teaching, projects and outreach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not extracting from people without giving anything back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Transcribe, code and write
- Field, interviews and observation
- Archive, literature and research design
- Ethics, consent and communities
- Teaching, projects and outreach
- antropologo
- anthropologist
Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2632
IS WORK OVER?
Aerospace engineer
25%
#228 / 633
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144