Automation index
How much of a Anthropologist’s job can AI already do?
A transcript and a code come earlier. Being in the field and not projecting too much do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Anthropologist
23%
AI can already do 23% of this job.
#321 / 733
View rankingAnthropologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Transcribe, code and write.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Field, interviews and observation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Archive, literature and research design.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Ethics, consent and communities.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Teaching, projects and outreach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not extracting from people without giving anything back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Transcribe, code and write
- Field, interviews and observation
- Archive, literature and research design
- Ethics, consent and communities
- Teaching, projects and outreach
- antropologo
- anthropologist
Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2632
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142