IS WORK OVER?

Automation index

How much of a Aquaculturist’s job can AI already do?

An oxygen reading and a ration come earlier. The batch not dying in the night do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Aquaculturist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Oxygen, ration and the mortality log.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cage, net and the escape.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Water quality, exchange and the bloom.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Vaccines, the vet and the batch that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The storm, the swell and not losing the cage.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not dying in the night, and not pushing density.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cage oxygen
  • fish ration
  • nets
  • water quality
  • aquaculture mortality
  • batch vaccines
  • swell
  • stocking density

Sources for this job· O*NET 45-1011.00· ESCO/ISCO 6221

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 314Printer technician23%
  2. 315Crime scene technician23%
  3. 316CCTV technician23%
  4. 318Insulation installer22%
  5. 319Pesticide applicator22%
  6. 320Archaeologist22%