Automation index
How much of a Aquaculturist’s job can AI already do?
An oxygen reading and a ration come earlier. The batch not dying in the night do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Aquaculturist
22%
AI can already do 22% of this job.
#317 / 623
View rankingAquaculturist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Oxygen, ration and the mortality log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cage, net and the escape.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Water quality, exchange and the bloom.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vaccines, the vet and the batch that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The storm, the swell and not losing the cage.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not dying in the night, and not pushing density.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cage oxygen
- fish ration
- nets
- water quality
- aquaculture mortality
- batch vaccines
- swell
- stocking density
Sources for this job· O*NET 45-1011.00· ESCO/ISCO 6221
IS WORK OVER?
Process engineer
26%
#205 / 623
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141