Automation index
How much of a Arborist’s job can AI already do?
A risk report comes earlier. Climbing, pruning and not dropping the tree on the roof do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Arborist
19%
AI can already do 19% of this job.
#573 / 753
View rankingArborist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess, risk and the owner’s report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, prune and the anchor.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Controlled fell and the one over the cable.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Arisings, chipping and leaving it clean.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the permit and not entering their plot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not dropping it on the roof, and coming down whole.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crown work
- climb
- controlled fell
- risk report
- anchors
- chipping
- cables
- felling permits
Sources for this job· O*NET 37-3013.00· ESCO/ISCO 6113
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115