Automation index
How much of a Arborist’s job can AI already do?
A risk report comes earlier. Climbing, pruning and not dropping the tree on the roof do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Arborist
19%
AI can already do 19% of this job.
#486 / 643
View rankingArborist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess, risk and the owner’s report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, prune and the anchor.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Controlled fell and the one over the cable.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Arisings, chipping and leaving it clean.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the permit and not entering their plot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not dropping it on the roof, and coming down whole.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crown work
- climb
- controlled fell
- risk report
- anchors
- chipping
- cables
- felling permits
Sources for this job· O*NET 37-3013.00· ESCO/ISCO 6113
IS WORK OVER?
Renewables engineer
27%
#165 / 643
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149