IS WORK OVER?

Automation index

How much of a Arborist’s job can AI already do?

A risk report comes earlier. Climbing, pruning and not dropping the tree on the roof do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Arborist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assess, risk and the owner’s report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, prune and the anchor.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Controlled fell and the one over the cable.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Arisings, chipping and leaving it clean.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the permit and not entering their plot.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not dropping it on the roof, and coming down whole.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • crown work
  • climb
  • controlled fell
  • risk report
  • anchors
  • chipping
  • cables
  • felling permits

Sources for this job· O*NET 37-3013.00· ESCO/ISCO 6113

Shutter installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order and the box that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Box, axle and the motor in the opening.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tape, slats and the one that derails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Program the remote and the limit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the inner courtyard and not scratching the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it runs true, and not leaving a lame box.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure shutters
  • fit boxes
  • shutter motors
  • slats
  • limit switches
  • tape
  • program remotes
  • axles

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Analyse my job

Jobs with similar scores

  1. 474Piano tuner19%
  2. 475Potter19%
  3. 476Wall tiler19%
  4. 478Grill cook19%
  5. 479Props master19%
  6. 480Dental assistant19%