Automation index
How much of a Arborist’s job can AI already do?
A risk report comes earlier. Climbing, pruning and not dropping the tree on the roof do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Arborist
19%
AI can already do 19% of this job.
#566 / 743
View rankingArborist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess, risk and the owner’s report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, prune and the anchor.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Controlled fell and the one over the cable.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Arisings, chipping and leaving it clean.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the permit and not entering their plot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not dropping it on the roof, and coming down whole.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crown work
- climb
- controlled fell
- risk report
- anchors
- chipping
- cables
- felling permits
Sources for this job· O*NET 37-3013.00· ESCO/ISCO 6113
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142