IS WORK OVER?

Automation index

How much of a Archaeologist’s job can AI already do?

A report and a sheet come earlier. Digging and not breaking the context do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Archaeologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sheets, drawing and the intervention report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Excavate, sieve and record units.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Authorities, developer and site deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Lab, dating and publication.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Store, conservation and outreach.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not losing a context by going too fast.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Excavate, sieve and record units
  • Authorities, developer and site deadlines
  • Lab, dating and publication
  • Store, conservation and outreach
  • Not losing a context by going too fast
  • arqueologo
  • archaeologist

Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2632

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 317Aquaculturist22%
  2. 318Insulation installer22%
  3. 319Pesticide applicator22%
  4. 321Building surveyor22%
  5. 322Foley artist22%
  6. 323Poultry farmer22%