IS WORK OVER?

Automation index

How much of a Archaeologist’s job can AI already do?

A report and a sheet come earlier. Digging and not breaking the context do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Archaeologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sheets, drawing and the intervention report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Excavate, sieve and record units.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Authorities, developer and site deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Lab, dating and publication.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Store, conservation and outreach.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not losing a context by going too fast.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Excavate, sieve and record units
  • Authorities, developer and site deadlines
  • Lab, dating and publication
  • Store, conservation and outreach
  • Not losing a context by going too fast
  • arqueologo
  • archaeologist

Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2632

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 317Aquaculturist22%
  2. 318Insulation installer22%
  3. 319Pesticide applicator22%
  4. 321Building surveyor22%
  5. 322Foley artist22%
  6. 323Poultry farmer22%