IS WORK OVER?

Automation index

How much of a Archaeologist’s job can AI already do?

A report and a sheet come earlier. Digging and not breaking the context do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Archaeologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sheets, drawing and the intervention report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Excavate, sieve and record units.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Authorities, developer and site deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Lab, dating and publication.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Store, conservation and outreach.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not losing a context by going too fast.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Excavate, sieve and record units
  • Authorities, developer and site deadlines
  • Lab, dating and publication
  • Store, conservation and outreach
  • Not losing a context by going too fast
  • arqueologo
  • archaeologist

Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2632

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 352Insulation installer22%
  2. 353Adult literacy tutor22%
  3. 354Pesticide applicator22%
  4. 356Building surveyor22%
  5. 357Foley artist22%
  6. 358Language assistant22%