IS WORK OVER?

Automation index

Can AI do the work of a Architect?

A model can already draft plans, renders and a first spec. Stamping, client fights and liability stay with the architect.

It also does not predict how many people will lose their jobs.

Task comparison

Architect

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source pins this saving. It is an estimate of the method.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source pins this saving. It is an estimate of the method.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source pins this saving. It is an estimate of the method.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source pins this saving. It is an estimate of the method.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source pins this saving. It is an estimate of the method.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source pins this saving. It is an estimate of the method.

12%8%+1
Total100%28%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Cloud architect

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Diagrams, ADRs and a first IaC pass.
Estimate

No public source pins this saving. It is an estimate of the method.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source pins this saving. It is an estimate of the method.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source pins this saving. It is an estimate of the method.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source pins this saving. It is an estimate of the method.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source pins this saving. It is an estimate of the method.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source pins this saving. It is an estimate of the method.

14%14%+2
Total100%28%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Nearby in the ranking

  1. 47Social worker29%
  2. 48Database administrator28%
  3. 49Farmer28%
  4. 51Cloud architect28%
  5. 52Barista28%
  6. 53Waiter28%