IS WORK OVER?

Automation index

How much of a Architect’s job can AI already do?

A model can already draft plans, renders and a first spec. Stamping, client fights and liability stay with the architect.

This percentage does not predict how many people will lose their jobs.

Task comparison

Architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source provides a precise figure. This is our estimate.

12%8%+1
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 78Farmer28%
  2. 79Logistics analyst28%
  3. 80SOC analyst28%
  4. 82Cloud architect28%
  5. 83Data architect28%
  6. 84Barista28%