Automation index
Can AI do the work of a Architect?
A model can already draft plans, renders and a first spec. Stamping, client fights and liability stay with the architect.
It also does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Architect
28%
AI or a robot can already do 28% of this job.
#50 / 103
View rankingArchitect
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Draft plans, sections and a first BIM model from the brief.EstimateNo public source pins this saving. It is an estimate of the method. | 22% | 48% | +10.6 |
Produce renders, views and façade options.EstimateNo public source pins this saving. It is an estimate of the method. | 18% | 40% | +7.2 |
Write quantities, specs and the project report.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 28% | +4.5 |
Meetings with client, developer and planning office.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 18% | +2.9 |
Site direction and inspection visits.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 12% | +1.9 |
Stamp, register and own legal responsibility.EstimateNo public source pins this saving. It is an estimate of the method. | 12% | 8% | +1 |
| Total | 100% | 28% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- building plans
- renders
- sign a project
- Produce renders, views and façade options
- Site direction and inspection visits
- arquitect
- architect
- proyecto de edificio
Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161
IS WORK OVER?
Electrician
24%↑
#83 / 103
View rankingElectrician
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Use a variety of tools or equipment, such as power construction equipment, measuring devices, power tools, and testing equipment, such as oscilloscopes, ammeters, or test lamps.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Work from ladders, scaffolds, or roofs to install, maintain, or repair electrical wiring, equipment, or fixtures.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 12% | +1.2 |
Prepare sketches or follow blueprints to determine the location of wiring or equipment and to ensure conformance to building and safety codes.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 28% | +2.2 |
Assemble, install, test, or maintain electrical or electronic wiring, equipment, appliances, apparatus, or fixtures, using hand tools or power tools.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 28% | +2.2 |
Place conduit, pipes, or tubing, inside designated partitions, walls, or other concealed areas, and pull insulated wires or cables through the conduit to complete circuits between boxes.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 28% | +2.2 |
Direct or train workers to install, maintain, or repair electrical wiring, equipment, or fixtures.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 12% | +0.7 |
Inspect electrical systems, equipment, or components to identify hazards, defects, or the need for adjustment or repair, and to ensure compliance with codes.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 12% | +0.6 |
Perform physically demanding tasks, such as digging trenches to lay conduit or moving or lifting heavy objects.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 12% | +0.6 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 40% | 28% | +11.2 |
| Total | 100% | 24% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- install wiring
- electrical panels
- repair faults
- building systems monitoring technology
- electricity
- work ergonomically
- resolve equipment malfunctions
- inspect electrical supplies
- splice cable
- inspect construction supplies
Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411