IS WORK OVER?

Automation index

Can AI do the work of a Architect?

A model can already draft plans, renders and a first spec. Stamping, client fights and liability stay with the architect.

It also does not predict how many people will lose their jobs.

Task comparison

Architect

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source pins this saving. It is an estimate of the method.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source pins this saving. It is an estimate of the method.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source pins this saving. It is an estimate of the method.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source pins this saving. It is an estimate of the method.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source pins this saving. It is an estimate of the method.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source pins this saving. It is an estimate of the method.

12%8%+1
Total100%28%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Mason

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Read drawings, measure and order material.
Estimate

No public source pins this saving. It is an estimate of the method.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source pins this saving. It is an estimate of the method.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source pins this saving. It is an estimate of the method.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source pins this saving. It is an estimate of the method.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source pins this saving. It is an estimate of the method.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source pins this saving. It is an estimate of the method.

14%15%+2.1
Total100%15%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Nearby in the ranking

  1. 47Social worker29%
  2. 48Database administrator28%
  3. 49Farmer28%
  4. 51Cloud architect28%
  5. 52Barista28%
  6. 53Waiter28%