IS WORK OVER?

Automation index

How much of a Architect’s job can AI already do?

A model can already draft plans, renders and a first spec. Stamping, client fights and liability stay with the architect.

This percentage does not predict how many people will lose their jobs.

Task comparison

Architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source provides a precise figure. This is our estimate.

12%8%+1
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 78Farmer28%
  2. 79Logistics analyst28%
  3. 80SOC analyst28%
  4. 82Cloud architect28%
  5. 83Data architect28%
  6. 84Barista28%