IS WORK OVER?

Automation index

How much of a Architect’s job can AI already do?

A model can already draft plans, renders and a first spec. Stamping, client fights and liability stay with the architect.

This percentage does not predict how many people will lose their jobs.

Task comparison

Architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source provides a precise figure. This is our estimate.

12%8%+1
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Printing press operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Preflight, imposition and colour profiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Calibrate, ink and start the press.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Watch register, density and defects on the run.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Job change, plates and wash-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Finishing, guillotine and delivery.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Stock, times and liability for the run.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run offset
  • calibrate colour
  • preflight files
  • watch register
  • ink the press
  • avoid wasting the run
  • imposition
  • change plates

Sources for this job· O*NET 51-5112.00· ESCO/ISCO 7322

Analyse my job

Jobs with similar scores

  1. 78Farmer28%
  2. 79Logistics analyst28%
  3. 80SOC analyst28%
  4. 82Cloud architect28%
  5. 83Data architect28%
  6. 84Barista28%