IS WORK OVER?

Automation index

How much of a Architect’s job can AI already do?

A model can already draft plans, renders and a first spec. Stamping, client fights and liability stay with the architect.

This percentage does not predict how many people will lose their jobs.

Task comparison

Architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source provides a precise figure. This is our estimate.

12%8%+1
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Research scientist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Literature review, figures and drafts.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Analysis, code and experiment boards.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Design the study and the controls.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Run the experiment or the fieldwork.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Lead a group, theses and authorship fights.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Win funding and answer reviewers.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Literature review, figures and drafts
  • Analysis, code and experiment boards
  • Design the study and the controls
  • Run the experiment or the fieldwork
  • Lead a group, theses and authorship fights
  • Win funding and answer reviewers
  • cientifico
  • investigador
  • research scientist

Sources for this job· O*NET 19-1029.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 47Social worker29%
  2. 48Database administrator28%
  3. 49Farmer28%
  4. 51Cloud architect28%
  5. 52Barista28%
  6. 53Waiter28%