Automation index
How much of a Art conservator’s job can AI already do?
A photo and an analysis come earlier. The scalpel, and not loading the work, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Art conservator
21%
AI can already do 21% of this job.
#531 / 753
View rankingArt conservator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Survey, photos, analysis and the treatment proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cleaning, fill, inpainting and protection.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Reversibility, and not overworking the piece.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, dossier and the owner’s or museum’s yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Transport, climate and the piece’s setting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Ethics and liability for what is touched.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- conserve art
- clean paint
- inpainting
- fills
- treatment report
- reversibility
- analyse the work
- not overworking the piece
Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2621
IS WORK OVER?
CAD designer
27%
#204 / 753
View rankingCAD designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimensions and the drawing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clash, the hit and not leaving it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
List, the material and the one that does not exist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the revision and not losing the native.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shop, the doubt and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be made, and not leaving the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- 3D models
- dimensions
- clashes
- bills of materials
- revisions
- shop drawings
- natives
- hits
Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118