IS WORK OVER?

Automation index

How much of a Art conservator’s job can AI already do?

A photo and an analysis come earlier. The scalpel, and not loading the work, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Art conservator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Survey, photos, analysis and the treatment proposal.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cleaning, fill, inpainting and protection.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Reversibility, and not overworking the piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, dossier and the owner’s or museum’s yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Transport, climate and the piece’s setting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Ethics and liability for what is touched.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • conserve art
  • clean paint
  • inpainting
  • fills
  • treatment report
  • reversibility
  • analyse the work
  • not overworking the piece

Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2621

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Analyse my job

Jobs with similar scores

  1. 433Pediatrician21%
  2. 434Psychiatrist21%
  3. 435Shelf replenisher21%
  4. 437Sommelier21%
  5. 438Taxidermist21%
  6. 439Network technician21%