Automation index
How much of a Art conservator’s job can AI already do?
A photo and an analysis come earlier. The scalpel, and not loading the work, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Art conservator
21%
AI can already do 21% of this job.
#436 / 633
View rankingArt conservator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Survey, photos, analysis and the treatment proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cleaning, fill, inpainting and protection.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Reversibility, and not overworking the piece.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, dossier and the owner’s or museum’s yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Transport, climate and the piece’s setting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Ethics and liability for what is touched.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- conserve art
- clean paint
- inpainting
- fills
- treatment report
- reversibility
- analyse the work
- not overworking the piece
Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2621
IS WORK OVER?
Forklift operator
17%
#587 / 633
View rankingForklift operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Notes, locations and picking routes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, lift and stack.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Loads, centres of gravity and aisles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Shift, radio and dock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, incidents and counts.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not hitting anyone or a pallet.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Notes, locations and picking routes
- Drive, lift and stack
- Loads, centres of gravity and aisles
- Shift, radio and dock
- Logs, incidents and counts
- Not hitting anyone or a pallet
- carretillero
- carretilla
- forklift
Sources for this job· O*NET 53-7051.00· ESCO/ISCO 8344