Automation index
How much of a Art conservator’s job can AI already do?
A photo and an analysis come earlier. The scalpel, and not loading the work, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Art conservator
21%
AI can already do 21% of this job.
#531 / 753
View rankingArt conservator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Survey, photos, analysis and the treatment proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cleaning, fill, inpainting and protection.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Reversibility, and not overworking the piece.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, dossier and the owner’s or museum’s yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Transport, climate and the piece’s setting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Ethics and liability for what is touched.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- conserve art
- clean paint
- inpainting
- fills
- treatment report
- reversibility
- analyse the work
- not overworking the piece
Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2621
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165