Automation index
How much of a Art conservator’s job can AI already do?
A photo and an analysis come earlier. The scalpel, and not loading the work, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Art conservator
21%
AI can already do 21% of this job.
#436 / 633
View rankingArt conservator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Survey, photos, analysis and the treatment proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cleaning, fill, inpainting and protection.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Reversibility, and not overworking the piece.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, dossier and the owner’s or museum’s yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Transport, climate and the piece’s setting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Ethics and liability for what is touched.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- conserve art
- clean paint
- inpainting
- fills
- treatment report
- reversibility
- analyse the work
- not overworking the piece
Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2621
IS WORK OVER?
Mechanical engineer
25%
#239 / 633
View rankingMechanical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, model and simulate parts and assemblies.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and bills of materials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Meetings with shop, client and purchasing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Tests, prototypes and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Rules, quality and CE documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Sign, register and own the design.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Meetings with shop, client and purchasing
- Tests, prototypes and commissioning
- Rules, quality and CE documentation
- Sign, register and own the design
- ingeniero mecanico
- mechanical engineer
Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144