Automation index
How much of a Art conservator’s job can AI already do?
A photo and an analysis come earlier. The scalpel, and not loading the work, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Art conservator
21%
AI can already do 21% of this job.
#515 / 733
View rankingArt conservator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Survey, photos, analysis and the treatment proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cleaning, fill, inpainting and protection.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Reversibility, and not overworking the piece.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, dossier and the owner’s or museum’s yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Transport, climate and the piece’s setting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Ethics and liability for what is touched.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- conserve art
- clean paint
- inpainting
- fills
- treatment report
- reversibility
- analyse the work
- not overworking the piece
Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2621
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142