IS WORK OVER?

Automation index

How much of a Art conservator’s job can AI already do?

A photo and an analysis come earlier. The scalpel, and not loading the work, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Art conservator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Survey, photos, analysis and the treatment proposal.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cleaning, fill, inpainting and protection.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Reversibility, and not overworking the piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, dossier and the owner’s or museum’s yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Transport, climate and the piece’s setting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Ethics and liability for what is touched.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • conserve art
  • clean paint
  • inpainting
  • fills
  • treatment report
  • reversibility
  • analyse the work
  • not overworking the piece

Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2621

Ship captain

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Passage plan, weather and clearance.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bridge, manoeuvre and people aboard.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Crew, watches and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Port, pilots and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, SOPEP and breakdowns.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not losing a ship or a person.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Passage plan, weather and clearance
  • Bridge, manoeuvre and people aboard
  • Crew, watches and fatigue
  • Port, pilots and owner
  • Safety, SOPEP and breakdowns
  • Not losing a ship or a person
  • capitan de barco
  • patron de altura
  • ship captain

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

Analyse my job

Jobs with similar scores

  1. 442Pediatrician21%
  2. 443Psychiatrist21%
  3. 444Shelf replenisher21%
  4. 446Sommelier21%
  5. 447Taxidermist21%
  6. 448Network technician21%