Automation index
How much of a Astronomer’s job can AI already do?
A night of telescope time comes earlier. Reducing the data without selling the find early do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Astronomer
27%
AI can already do 27% of this job.
#139 / 753
View rankingAstronomer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Proposal, time and the instrument.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Observe, calibrate and the one that clouds over.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Reduce, the pipeline and the artefact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Paper, the referee and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The facility, the queue and not losing the night.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Reduce, and not selling the find early.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- telescope time
- calibrate
- pipelines
- papers
- artefacts
- nights
- proposals
- instruments
Sources for this job· O*NET 19-2011.00· ESCO/ISCO 2111
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165