IS WORK OVER?

Automation index

How much of a Astronomer’s job can AI already do?

A night of telescope time comes earlier. Reducing the data without selling the find early do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Astronomer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Proposal, time and the instrument.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Observe, calibrate and the one that clouds over.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Reduce, the pipeline and the artefact.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Paper, the referee and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The facility, the queue and not losing the night.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Reduce, and not selling the find early.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • telescope time
  • calibrate
  • pipelines
  • papers
  • artefacts
  • nights
  • proposals
  • instruments

Sources for this job· O*NET 19-2011.00· ESCO/ISCO 2111

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 131Investment analyst27%
  2. 132Tactical analyst27%
  3. 133VFX artist27%
  4. 135Banker27%
  5. 136Bid manager27%
  6. 137Carpenter27%