Automation index
How much of a Audiologist’s job can AI already do?
An audiogram and a curve tweak come earlier. Fitting an aid so the person actually hears does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Audiologist
23%
AI can already do 23% of this job.
#288 / 633
View rankingAudiologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Audiograms, thresholds and a first fit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Trial, mould and adapt the aid.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Explain, habituation and follow-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Reports for ENT and notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Repair, clean and prototype stock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Children, older people and not overselling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Audiograms, thresholds and a first fit
- Trial, mould and adapt the aid
- Explain, habituation and follow-up
- Reports for ENT and notes
- Repair, clean and prototype stock
- Children, older people and not overselling
- audiologo
- audiologist
Sources for this job· O*NET 29-1181.00· ESCO/ISCO 2266
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146