Automation index
How much of a Auditor’s job can AI already do?
Today an AI can already classify, reconcile, and prep a first close. The final call, and what goes to the tax office, still has a name on it.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Auditor
35%
AI can already do 35% of this job.
#16 / 623
View rankingAuditor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Supervise auditing of establishments, and determine scope of investigation required.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 22% | +2.6 |
Analyze business operations, trends, costs, revenues, financial commitments, and obligations to project future revenues and expenses or to provide advice.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 48% | +4.3 |
Develop, implement, modify, and document recordkeeping and accounting systems, making use of current computer technology.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 55% | +4.4 |
Report to management regarding the finances of establishment.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 55% | +3.9 |
Inspect account books and accounting systems for efficiency, effectiveness, and use of accepted accounting procedures to record transactions.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 55% | +3.9 |
Prepare adjusting journal entries.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Review accounts for discrepancies and reconcile differences.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Establish tables of accounts and assign entries to proper accounts.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 38% | 28% | +10.6 |
| Total | 100% | 35% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- ledger entries
- close accounts
- reconcile banks
- accounting department processes
- financial department processes
- economics
- corporate law
- accounting
- inspect tax returns
- control financial resources
Sources for this job· O*NET 13-2011.00· ESCO/ISCO 2411
IS WORK OVER?
Carpenter
27%
#137 / 623
View rankingCarpenter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Follow established safety rules and regulations and maintain a safe and clean environment.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Shape or cut materials to specified measurements, using hand tools, machines, or power saws.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Assemble and fasten materials to make frameworks or props, using hand tools and wood screws, nails, dowel pins, or glue.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Build or repair cabinets, doors, frameworks, floors, or other wooden fixtures used in buildings, using woodworking machines, carpenter's hand tools, or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Verify trueness of structure, using plumb bob and level.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 45% | 28% | +12.6 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install locks
- work ergonomically
- apply proofing membranes
- cut insulation material to size
- use shims
- inspect construction supplies
- manipulate glass
- use measurement instruments
- apply insulation strips
- use safety equipment in construction
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115