Automation index
Can AI do the work of a Auditor?
Today an AI can already classify, reconcile, and prep a first close. The final call, and what goes to the tax office, still has a name on it.
No number on this site decides whether someone keeps or loses their job.
Task comparison
IS WORK OVER?
Auditor
35%
AI or a robot can already do 35% of this job.
#16 / 103
View rankingAuditor
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Supervise auditing of establishments, and determine scope of investigation required.EstimateNo public source pins this saving. It is an estimate of the method. | 12% | 22% | +2.6 |
Analyze business operations, trends, costs, revenues, financial commitments, and obligations to project future revenues and expenses or to provide advice.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 48% | +4.3 |
Develop, implement, modify, and document recordkeeping and accounting systems, making use of current computer technology.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 55% | +4.4 |
Report to management regarding the finances of establishment.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 55% | +3.9 |
Inspect account books and accounting systems for efficiency, effectiveness, and use of accepted accounting procedures to record transactions.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 55% | +3.9 |
Prepare adjusting journal entries.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Review accounts for discrepancies and reconcile differences.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Establish tables of accounts and assign entries to proper accounts.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 38% | 28% | +10.6 |
| Total | 100% | 35% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- ledger entries
- close accounts
- reconcile banks
- accounting department processes
- financial department processes
- economics
- corporate law
- accounting
- inspect tax returns
- control financial resources
Sources for this job· O*NET 13-2011.00· ESCO/ISCO 2411
IS WORK OVER?
Carpenter
27%
#72 / 103
View rankingCarpenter
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Follow established safety rules and regulations and maintain a safe and clean environment.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 28% | +2.5 |
Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 28% | +2.5 |
Shape or cut materials to specified measurements, using hand tools, machines, or power saws.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 28% | +2.2 |
Assemble and fasten materials to make frameworks or props, using hand tools and wood screws, nails, dowel pins, or glue.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Build or repair cabinets, doors, frameworks, floors, or other wooden fixtures used in buildings, using woodworking machines, carpenter's hand tools, or power tools.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 12% | +0.7 |
Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Verify trueness of structure, using plumb bob and level.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 45% | 28% | +12.6 |
| Total | 100% | 27% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- install locks
- work ergonomically
- apply proofing membranes
- cut insulation material to size
- use shims
- inspect construction supplies
- manipulate glass
- use measurement instruments
- apply insulation strips
- use safety equipment in construction
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115