IS WORK OVER?

Automation index

How much of a Automation engineer’s job can AI already do?

A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PLC, SCADA and the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Panel, loops and the lying sensor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
FAT, SAT and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Recipes, batches and the product change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shift, the alarm and not bypassing the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not trip, and documenting the program.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • SCADA
  • interlocks
  • control loops
  • FAT SAT
  • commissioning
  • plant alarms
  • automation panels

Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149

Biomedical equipment technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ticket, the inventory and the calibration.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
ICU, the ventilator and not switching off the one that is ventilating.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Theatre, the stack and the one that fails at induction.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Part, the spare and the one that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The clinician, the rush and not leaving the kit half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it works at three, and signing the calibration.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calibrate biomedical kit
  • ventilators
  • theatre stacks
  • clinical inventory
  • spares
  • ICU
  • not switch off the one ventilating
  • tickets

Sources for this job· O*NET 49-9062.00· ESCO/ISCO 3211

Analyse my job

Jobs with similar scores

  1. 159Hepatologist27%
  2. 160Printing press operator27%
  3. 161Food engineer27%
  4. 163Energy engineer27%
  5. 164Packaging engineer27%
  6. 165Materials engineer27%