Automation index
How much of a Automation engineer’s job can AI already do?
A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Automation engineer
27%
AI can already do 27% of this job.
#159 / 633
View rankingAutomation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PLC, SCADA and the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Panel, loops and the lying sensor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
FAT, SAT and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Recipes, batches and the product change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shift, the alarm and not bypassing the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not trip, and documenting the program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program PLCs
- SCADA
- interlocks
- control loops
- FAT SAT
- commissioning
- plant alarms
- automation panels
Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149
IS WORK OVER?
Boiler technician
20%
#469 / 633
View rankingBoiler technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, fault codes and spares.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Routes, appointments and permits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Diagnose, open and repair the boiler.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Tune-up, combustion and pressures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Clients, porters and plant-room access.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Gas, safety and not leaving the building cold.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, fault codes and spares
- Routes, appointments and permits
- Diagnose, open and repair the boiler
- Tune-up, combustion and pressures
- Clients, porters and plant-room access
- calderas
- tecnico de calderas
- calefaccion central
Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126