Automation index
How much of a Automation engineer’s job can AI already do?
A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Automation engineer
27%
AI can already do 27% of this job.
#159 / 623
View rankingAutomation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PLC, SCADA and the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Panel, loops and the lying sensor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
FAT, SAT and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Recipes, batches and the product change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shift, the alarm and not bypassing the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not trip, and documenting the program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program PLCs
- SCADA
- interlocks
- control loops
- FAT SAT
- commissioning
- plant alarms
- automation panels
Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149
IS WORK OVER?
Factory operator
24%
#276 / 623
View rankingFactory operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, SOPs and quality records.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 38% | +6.1 |
Read orders and line screens.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 32% | +4.5 |
Feed, run and unjam the line.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 18% | +4 |
Changeover and tool cleaning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
In-station quality and stopping a defect.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Shifts, safety and coworkers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, SOPs and quality records
- Read orders and line screens
- Feed, run and unjam the line
- Changeover and tool cleaning
- In-station quality and stopping a defect
- Shifts, safety and coworkers
- operario de fabrica
- factory operator
- linea de produccion
Sources for this job· O*NET 51-2099.00· ESCO/ISCO 8211