Automation index
How much of a Automation engineer’s job can AI already do?
A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Automation engineer
27%
AI can already do 27% of this job.
#159 / 623
View rankingAutomation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PLC, SCADA and the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Panel, loops and the lying sensor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
FAT, SAT and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Recipes, batches and the product change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shift, the alarm and not bypassing the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not trip, and documenting the program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program PLCs
- SCADA
- interlocks
- control loops
- FAT SAT
- commissioning
- plant alarms
- automation panels
Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149
IS WORK OVER?
Network technician
21%
#434 / 623
View rankingNetwork technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, inventory and standard configs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Tickets, remote diagnosis and logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Pulling, racking, crimping and labelling.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Bring up links, VLANs and site Wi-Fi.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
On-call, outages and user care.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Vendors, civil work and access.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Diagrams, inventory and standard configs
- Tickets, remote diagnosis and logs
- Pulling, racking, crimping and labelling
- Bring up links, VLANs and site Wi-Fi
- On-call, outages and user care
- Vendors, civil work and access
- tecnico de redes
- network technician
- cableador
- cisco
Sources for this job· O*NET 15-1241.00· ESCO/ISCO 3513