IS WORK OVER?

Automation index

How much of a Automation engineer’s job can AI already do?

A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PLC, SCADA and the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Panel, loops and the lying sensor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
FAT, SAT and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Recipes, batches and the product change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shift, the alarm and not bypassing the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not trip, and documenting the program.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • SCADA
  • interlocks
  • control loops
  • FAT SAT
  • commissioning
  • plant alarms
  • automation panels

Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149

Pharmacovigilance officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Case, the file and MedDRA.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Seriousness, the link and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
File, the AEMPS deadline and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Signal, the aggregate and not playing it down.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The doctor, the ADR and not arguing the story.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
If it is serious, call it. And not staying quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ADR
  • MedDRA
  • AEMPS
  • safety signals
  • seriousness
  • causality
  • case files
  • regulatory deadlines

Sources for this job· O*NET 29-1051.00· ESCO/ISCO 2262

Analyse my job

Jobs with similar scores

  1. 158Hepatologist27%
  2. 159Printing press operator27%
  3. 160Food engineer27%
  4. 162Energy engineer27%
  5. 163Packaging engineer27%
  6. 164Materials engineer27%