IS WORK OVER?

Automation index

How much of a Automation engineer’s job can AI already do?

A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PLC, SCADA and the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Panel, loops and the lying sensor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
FAT, SAT and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Recipes, batches and the product change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shift, the alarm and not bypassing the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not trip, and documenting the program.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • SCADA
  • interlocks
  • control loops
  • FAT SAT
  • commissioning
  • plant alarms
  • automation panels

Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149

Property valuer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Comps, cadastre and a first value.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Visit, measurements and defects.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, photos and bank annexes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Client, lender and valuation deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Valuation rules and liability.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not signing a flat that is not worth that.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Comps, cadastre and a first value
  • Visit, measurements and defects
  • Report, photos and bank annexes
  • Client, lender and valuation deadlines
  • Valuation rules and liability
  • Not signing a flat that is not worth that
  • tasador inmobiliario
  • tasador
  • property valuer

Sources for this job· O*NET 13-2023.00· ESCO/ISCO 3315

Analyse my job

Jobs with similar scores

  1. 156Wealth manager27%
  2. 157Printing press operator27%
  3. 158Food engineer27%
  4. 160Energy engineer27%
  5. 161Packaging engineer27%
  6. 162Materials engineer27%