Automation index
How much of a Automation engineer’s job can AI already do?
A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Automation engineer
27%
AI can already do 27% of this job.
#163 / 673
View rankingAutomation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PLC, SCADA and the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Panel, loops and the lying sensor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
FAT, SAT and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Recipes, batches and the product change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shift, the alarm and not bypassing the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not trip, and documenting the program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program PLCs
- SCADA
- interlocks
- control loops
- FAT SAT
- commissioning
- plant alarms
- automation panels
Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149
IS WORK OVER?
Respiratory therapist
22%
#428 / 673
View rankingRespiratory therapist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Gases, the ventilator and the protocol.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Wean, the trial and the one who will not hold.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Physio, the sputum and the one who will not cough.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
ICU, the alarm and not dropping FiO2 extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The intensivist, the tube and not rushing extubation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Pull the tube, and that they breathe alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- weaning
- ventilators
- arterial gases
- sputum
- extubation
- FiO2
- respiratory physio
- ICU
Sources for this job· O*NET 29-1126.00· ESCO/ISCO 2269