IS WORK OVER?

Automation index

How much of a Automation engineer’s job can AI already do?

A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PLC, SCADA and the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Panel, loops and the lying sensor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
FAT, SAT and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Recipes, batches and the product change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shift, the alarm and not bypassing the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not trip, and documenting the program.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • SCADA
  • interlocks
  • control loops
  • FAT SAT
  • commissioning
  • plant alarms
  • automation panels

Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149

Sales promoter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, stand and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shelf, the one who walks by and the one who stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Tasting, allergies and not pushing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Data, contacts and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The supervisor, the space and not covering the shelf.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop the customer, and not lying.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stands
  • tasting
  • promo briefing
  • contacts
  • allergies
  • the shelf
  • promo kit
  • store supervisor

Sources for this job· O*NET 41-9011.00· ESCO/ISCO 5242

Analyse my job

Jobs with similar scores

  1. 156Wealth manager27%
  2. 157Printing press operator27%
  3. 158Food engineer27%
  4. 160Energy engineer27%
  5. 161Packaging engineer27%
  6. 162Materials engineer27%